top of page

Projects

Various past and present work.

Apco Service station

Construction of service station.

IMG_8346_edited.jpg
IMG_8431_edited.jpg

Tolsma 

Tolsma Potato Cold Store.

Bedford

Bedford timber processing facility excavation and construction.

IMG_8394_edited.jpg
IMG_8462_edited.jpg

Sign Depot

Sign Depot excavation and preparation.

Acciona

Acciona Plant Hire.

IMG_8367_edited.jpg
CHH demolition_edited_edited_edited.jpg

CHH Demolitions

Carter Holt Harvey's (CHH) sawmill demolition.

TAFE SA Building Trades

TAFE SA Construction Trades building preparation and carpark construction.

IMG_8095_edited_edited_edited_edited.jpg
-web- (2 of 22)_edited_edited.jpg

High School Music Room

High School Music Room development project, excavation, and preparation. 

McDonald's Carpark Extension 

Removal of existing buildings, site preparation, new carpark, and extension of drive-through renovations.  

maccas extention_edited_edited_edited.jp
-web- (3 of 3)_edited.jpg

ALDI Demolition and Buildup

Demolition of old buildings, excavation, footings, site preparation, and carpark. 

Mount Gambier Prison 

Prison upgrades, concrete preparation, sewer excavation, perimeter fence footings, and internal detail works. 

IMG_7240_edited_edited.jpg
council page 1_edited.jpg

Government Work 

Maintenance, design, and construction of both natural and physically built environments such as roads, building prep, and demolition.

Endeavor Petrol Station

10,000m2 of whole-site bulk excavation, all civil work, and concreting.

IMG_8120_edited.jpg
Photo 9 960px website_edited.jpg

Chemist King

Plateau preparation, excavation, removal of contaminated soil, building preparation, detailed footings, carpark work, kerbing and wheel stops. 

McDonald's Mount Gambier East

Construction, excavation, and preparation for new store and carpark.  

IMG_8027_edited_edited.jpg
IMG_7302_edited_edited_edited.jpg

DMK Engineering Workshop

Plateau construction for industrial shed, hard stand yard, kerbing, and hot mix. 

Whitty Engineering Workshop Development

Bulk excavation, plateau construction for industrial shed, construction hard stand, hot mix, and concrete. 

WE_edited.jpg
kiln_edited_edited.jpg

OFO Kiln Demolition and Redevelopment 

Removal of retired kilns, concrete, and remediation for new works.

Ashborne

Ashborne project stage one of two included site clearing, bulk excavation, and filling. Concrete preparation, concrete works and hard stand yard.

IMG_8142_edited_edited.jpg
naz silo 1_edited_edited.jpg

Viterra Naracoorte Silo 

Silo demolition and removal, including steel and concrete. Compaction of filled-in elevator shafts. 

Mitre 10 Naracoorte 

Bulk filling for plateau construction of 4,000 tonnes, carpark construction including kerbing and hot mix of 8,000m2.  

mitre 10_edited.jpg
DJI_0281_edited_edited.jpg

Nine Country Allotment Subdivision

1.2km of country road ways, excavation, and laying of  SAPN conduits. 

Next Timber

Bulk excavation, supply and placement of 70,000 tonnes of controlled fill for a concrete building pad. Construction of external roads and stormwater, including swails and drains.

DJI_0392_edited_edited.jpg

Other Completed Projects

McDonald's Naracoorte
This
 project included plateau construction under level one supervision, carpark construction including kerbing, concrete and hot mix. 

Bonham Cottages Millicent

This project included level one plateau construction for a housing estate of 4,000m2.  Detailed excavation and paving preparations for carpark works including concrete, kerbing and hot mix.

bottom of page